Elizabethtown College Facilities News ![]()
Back to top 7/20/2006 Esbenshade Electrical Outage The final two electrical outages for Esbenshade and Musser have been scheduled for July 27th and August 3rd between 5:30 and 7:30 AM. The first outage will allow the electrical contractor to safely pull in the new high voltage conductors and the second outage will be to terminate the new lines. These outages will complete the high voltage revisions and future outages will be confined to areas within the buildings. Thanks for your patience. |
Back to News Index




















